共享点叠加层 [英] Sharepoint Overlays

查看:70
本文介绍了共享点叠加层的处理方法,对大家解决问题具有一定的参考价值,需要的朋友们下面随着小编来一起学习吧!

问题描述

我创建了一个人力资源日历,该日历可以流到Sharepoint中的其他部门日历.例如,我在HR日历中设置假期,它们通过覆盖显示在Sharepoint的每个部门日历中.用户同步部门日历时 到Outlook,除HR事件外,所有内容均显示.有没有办法同步此叠加层?

I have created an HR calendar that flows to other department calendars within Sharepoint. For example, I set holidays up in the HR calendar and they show in each department calendar within Sharepoint via an overlay. When a user syncs their department calendar to Outlook, everything shows except the HR events. Is there a way to sync this overlay as well?

如何让它们也显示在Outlook中?

谢谢.

How can I get them to show in Outlook as well?

Thank you.

推荐答案

如果您要在SharePoint中创建日历叠加层,这是您的答案:

If you are looking for creating Calendar Overlays in SharePoint, here is your answer:

按列值显示颜色日历事件


这篇关于共享点叠加层的文章就介绍到这了,希望我们推荐的答案对大家有所帮助,也希望大家多多支持IT屋!

查看全文
登录 关闭
扫码关注1秒登录
发送“验证码”获取 | 15天全站免登陆