根据日期计算Archer GRC中的状态 [英] Calculation for status in Archer GRC based on date
本文介绍了根据日期计算Archer GRC中的状态的处理方法,对大家解决问题具有一定的参考价值,需要的朋友们下面随着小编来一起学习吧!
问题描述
尝试根据用户从中选择的多个值列表创建状态字段,但已经提出要求我们检查日期字段中的值以确保已设置估计日期,以便计算可以确定如果记录的状态为进行中",延迟"或未开始".
Trying to create a status field based on a number of Value Lists that users select from, but a request has been made that we check a date field for a value to ensure an estimated date has been set so that the calculation can determine if the status of the record is "In Progress", "Late" or "Not Started".
推荐答案
您可以尝试在计算字段中使用ISEMPTY()
函数来验证日期字段中是否包含值.然后,使用DATEDIF
函数确定记录是迟到的还是进行中的.
You can try using the ISEMPTY()
function within your calculated field to verify that the date field contains a value. Then, use the DATEDIF
function to determine if record is late or in progress.
这篇关于根据日期计算Archer GRC中的状态的文章就介绍到这了,希望我们推荐的答案对大家有所帮助,也希望大家多多支持IT屋!
查看全文