修改Azure上WebJob调度 [英] Modify scheduling on Azure WebJob

查看:630
本文介绍了修改Azure上WebJob调度的处理方法,对大家解决问题具有一定的参考价值,需要的朋友们下面随着小编来一起学习吧!

问题描述

很多人一样,我热衷于能够如此轻易地被添加到Azure的网站轻量级WebJobs。

Like many others I am enthusiastic about the lightweight WebJobs that can so easily be added to Azure Websites.

不过,我认为与WebJobs的优势之一是可以轻松地修改调度。当我想我很惊讶,似乎有没有办法做到这一点。已部署WebJob似乎与最初的计划被卡住。​​

But I assumed one of the advantages with WebJobs was to easily modify the scheduling. When I tried I was surprised that there seems to be no way to do that. A deployed WebJob seems to be stuck with the initial scheduling.

我是否需要部署新的WebJobs刚刚修改的日程安排?

Do I need to deploy new WebJobs just to modify the scheduling?

推荐答案

我终于找到了。
计划在WebJobs主杆调度下出现的。

I finally found it. Scheduled WebJobs turn up under Scheduler in the main bar.

保存按钮是不可见的,直到你真正做出改变。

The Save button is not visible until you actually make a change.

这篇关于修改Azure上WebJob调度的文章就介绍到这了,希望我们推荐的答案对大家有所帮助,也希望大家多多支持IT屋!

查看全文
登录 关闭
扫码关注1秒登录
发送“验证码”获取 | 15天全站免登陆