SP Designer 2013工作流程 [英] SP Designer 2013 Workflow

查看:90
本文介绍了SP Designer 2013工作流程的处理方法,对大家解决问题具有一定的参考价值,需要的朋友们下面随着小编来一起学习吧!

问题描述

大家好,

我已经在sharepoint Designer 2013中创建工作流.

I have been create workflow in sharepoint designer 2013.

但是,同时 我根据请求状态从2种不同的表单中收到2封电子邮件 .

But, At the same time, I got 2 email from 2 different form based on Request status.

管理员在ID中附加文件( PC-20180301- 00043) 项目,用户 通知有关当前状态.在这种情况下,如果管理员将文件附加到当前项目中, 之前的项目将同时收到一封电子邮件 ..有人知道如何解决此问题吗?

When Admin attach the file in ID(PC-20180301-00043) item, user will get notification about the current status. In this case, if admin attach file in current item, items before that will receive an email at the same time.. Did anyone know how to solve this problem?

请帮助我!谢谢...

推荐答案

该情况是由等待列表项中的事件"操作引起的. 等待:更改项目时"为 用于等待更改项目.该项目应该是此列表中的任何项目.

The scenario is casued by the "Wait for Event in List Item" action. "Wait for Even: When an item is changed" is used to wait for an item to be changed. The item should be any item in this list.

因此,当您更新当前项目时,将触发工作流程的所有正在运行的工作流程实例.因此,您将从ID(PC-20180301-000432)项目收到电子邮件.

为避免这种情况,建议您改用等待当前项目的字段更改".

最好的问候,

王恩(Dean Wang)


这篇关于SP Designer 2013工作流程的文章就介绍到这了,希望我们推荐的答案对大家有所帮助,也希望大家多多支持IT屋!

查看全文
登录 关闭
扫码关注1秒登录
发送“验证码”获取 | 15天全站免登陆