项目资源分配未显示在容量规划视图中 [英] Project Resource Assignments not showing up in Capacity Planning View

查看:58
本文介绍了项目资源分配未显示在容量规划视图中的处理方法,对大家解决问题具有一定的参考价值,需要的朋友们下面随着小编来一起学习吧!

问题描述

我已将多个项目上传到PWA,保存并发布了项目。 已分配给这些项目的企业资源未在容量规划视图下显示分配。  

I have uploaded several projects into the PWA, saved and published the projects too.  Enterprise resources that have been assigned to these projects are not showing up with assignments under the capacity planning view.  

我可以看到他们在资源分配或时间表下的任务。 这就像数据没有进入容量规划或PowerBI链接。 它出现在我们设置的第一个项目开发服务器上,但是现在我正在重建
配置在新的站点/服务器中它似乎没有出现相同的项目数据。  ;

I can see their assignments under resources assignments or time sheets.  It's like the data isn't making it to the capacity planning or PowerBI links.  It was showing up on the first project dev server we had set up, however now that I'm rebuilding the configuration in a new site/server it doesn't seem to be showing up with the same project data. 

我是管理员,因此我认为它不应该是服务器设置。 是否有一些我缺少的设置?  

I'm an admin so I assume it shouldn't be a server setting.  Is there some setting that I'm missing?  

推荐答案

我无法找到设置或弄清楚为什么分配未显示在容量视图下。 我尝试应用那些似乎也不起作用的网站。
I haven't been able to find a setting or figure out why the assignments aren't showing up under the capacity view.  I tried applying sites however that didn't seem to work either.


这篇关于项目资源分配未显示在容量规划视图中的文章就介绍到这了,希望我们推荐的答案对大家有所帮助,也希望大家多多支持IT屋!