测试控制器VS2012的问题 [英] Problem with Test Controller VS2012
问题描述
你好
我安装了测试控制器。
Hello
I installed test controller.
我尝试用团队项目集合注册测试控制器。
I try to register test controller with Team project Collection.
但在配置中,它不起作用。
But at the configuration, it does not work.
在Logs中我有这样的错误:
In Logs i have this errors:
1。
(QTController.exe,PID 820,线程5)尝试加载控制器配置文件时收到异常:Microsoft.VisualStudio.TestTools.Exceptions.EqtException:与团队项目'ABC关联的测试环境'ABC.0.kl' '无法加载,因为测试
控制器未与团队基础服务器关联。
at Microsoft.VisualStudio.TestTools.Controller.ControllerConfiguration.ValidateLoadedTestEnvironment(TestEnvironment testEnvironment)
at Microsoft.VisualStudio.TestTools.Controller.ControllerConfiguration.Load(XmlElement element,XmlTestStoreParameters parameters,String controllerName)
at Microsoft.VisualStudio.TestTools.Controller.ControllerConfiguration..ctor(Int32 port,String controllerName,XmlElement element,XmlTestStoreParameters参数)
at Microsoft.VisualStudio.TestTools.Controller.ControllerServiceBase.OnStart(String [] args)
(QTController.exe, PID 820, Thread 5) Received exception trying to load controller configuration file: Microsoft.VisualStudio.TestTools.Exceptions.EqtException: Test environment 'ABC.0.kl' associated with team project 'ABC' could not be loaded, as the test
controller is not associated with a team foundation server.
at Microsoft.VisualStudio.TestTools.Controller.ControllerConfiguration.ValidateLoadedTestEnvironment(TestEnvironment testEnvironment)
at Microsoft.VisualStudio.TestTools.Controller.ControllerConfiguration.Load(XmlElement element, XmlTestStoreParameters parameters, String controllerName)
at Microsoft.VisualStudio.TestTools.Controller.ControllerConfiguration..ctor(Int32 port, String controllerName, XmlElement element, XmlTestStoreParameters parameters)
at Microsoft.VisualStudio.TestTools.Controller.ControllerServiceBase.OnStart(String[] args)
2.
(QTController.exe ,PID 820,线程5)发布ControllerObject时发生异常:Microsoft.VisualStudio.TestTools.Exceptions.EqtException:无法加载控制器配置文件C:\Program Files(x86)\ Microsoft Visual Studio 11.0\Common7 \IDE \QTControllerConfig.xml。
错误:无法加载与团队项目"ABC"关联的测试环境"ABC.0.kl",因为测试控制器未与团队基础服务器关联。
  at Microsoft.VisualStudio.TestTools.Controller.ControllerServiceBase.OnStart(String [] args)
(QTController.exe, PID 820, Thread 5) Exception occurred while publishing ControllerObject: Microsoft.VisualStudio.TestTools.Exceptions.EqtException: Failed to load controller configuration file C:\Program Files (x86)\Microsoft Visual Studio 11.0\Common7\IDE\QTControllerConfig.xml.
Error : Test environment 'ABC.0.kl' associated with team project 'ABC' could not be loaded, as the test controller is not associated with a team foundation server.
at Microsoft.VisualStudio.TestTools.Controller.ControllerServiceBase.OnStart(String[] args)
3.
Controller服务可以没有开始。无法加载控制器配置文件C:\Program Files(x86)\ Microsoft Visual Studio 11.0\Common7\IDE\QTControllerConfig.xml。错误:与团队项目'ABC'关联的测试环境'ABC.0.kl'可能无法加载
,因为测试控制器未与团队基础服务器关联。
The Controller service could not be started. Failed to load controller configuration file C:\Program Files (x86)\Microsoft Visual Studio 11.0\Common7\IDE\QTControllerConfig.xml. Error : Test environment 'ABC.0.kl' associated with team project 'ABC' could not be loaded, as the test controller is not associated with a team foundation server.
4.
现在"配置测试控制器"没有开始。
Now "Configure Test Controller" doesn't start.
更多信息:
我们从2010年迁移到2012年TFS
We migrated from 2010 to 2012 TFS
可以有人帮助我?
推荐答案
这篇文章似乎与Team Foundation Service(我们托管的TFS:
http://tfs.visualstudio.com )。是吗?
This post does not seem to relate to Team Foundation Service (our hosted TFS: http://tfs.visualstudio.com). Does it?