SharePoint 2013,链接2列表或带有日历的列表 [英] SharePoint 2013, link 2 lists or a list with a calendar

查看:92
本文介绍了SharePoint 2013,链接2列表或带有日历的列表的处理方法,对大家解决问题具有一定的参考价值,需要的朋友们下面随着小编来一起学习吧!

问题描述

我在sharepoint 2013上有任务列表,包括开始日期,结束日期和任务.我需要将其分别链接到日历,以便当我的团队更新任务列表时,日历也将更新.但是我不想将任务列表的视图更改为日历 由于还需要定期查看,过滤和更新列表.这可能吗?还是有一种方法可以创建现有任务列表的副本并更改副本的视图?

I have task list on sharepoint 2013, with start date, end date and task. I need to link it to a calendar separately so that when my team updates the task list, the calendar gets updated too. However i don't want to change the view of task list as calendar since the list is also required to be viewed, filtered and updated regularly. Is this possible? or is there a way i can create a duplicate of the existing task list and change the view of duplicate one?

谢谢

推荐答案

KShamik,

这里有两种方法可以实现.这两种方法都需要我们为任务列表创建日历视图.但是,我们无需将此日历视图设置为默认 视图.

Here are two methods to achieve that. Both methods need us to create a calendar view for the task list. But, we don’t need to make this calendar view as the default view.

1.使用列表应用程序Web部件.

(1)编辑要显示日历视图的页面,然后将此任务列表应用程序Web部件插入页面.

(1) Edit the page where you want to display the calendar view, then insert this task list app web part to the page.

(2)编辑任务Web部件,选择日历视图以显示列表.

2.使用日历覆盖.

(1)打开日历,单击日历"选项卡上的日历覆盖"功能区.

(2)在日历覆盖设置"页上,单击新建日历".

(3)输入任务所在的站点,然后单击解决". /span>

(3) Enter the site where the task locates, and click Resolve.

(4)选择任务.

最好的问候,

Linda Zhang


这篇关于SharePoint 2013,链接2列表或带有日历的列表的文章就介绍到这了,希望我们推荐的答案对大家有所帮助,也希望大家多多支持IT屋!

查看全文
登录 关闭
扫码关注1秒登录
发送“验证码”获取 | 15天全站免登陆