精确的过程事件时间线图(例如在Excel中) [英] Precise process event timeline diagrams (e.g. in Excel)

查看:2278
本文介绍了精确的过程事件时间线图(例如在Excel中)的处理方法,对大家解决问题具有一定的参考价值,需要的朋友们下面随着小编来一起学习吧!

问题描述

我需要准备这样的图表:





我认为这是非常直观的如何读取这个图,这就是为什么我想为我的项目创建一些。



我很困惑如何有效地创建它们;我画了上面的一个油漆只是为了快速可视化我的想法,它花了太长的imo。



我有具有事件时间的精确数据(例如正在加载过程1中开始加载在进程1中结束算法在进程2中开始等)例如

  1:
00.0 - 40.0 - 正在加载
40.0 - 45.0 - 准备和启动过程2
45.0 - 50.0 - 准备和启动过程3
50.0 - 90.0 - Sleep
90.0 - 95.0 - 加入过程2
...

过程2:
45.0 - 90.0 - 算法执行
...



如何生成此类时间线图?



我使用MS Windows 7并安装了Office 2010,但我愿意使用任何可以完成这项工作的任何东西。

解决方案

基本上,使用堆叠条形图:





详细解释所有步骤将是一场噩梦,但大致上,数据大致如下所示 A1:H4 。格式化数据系列白色,以便混合到背景中。添加数据标签并根据需要更改其文本(合并1等)。



我欺骗并绘制线条(例如在加载中)并将其格式化为白色,但额外的连接器为1ms应该线)。使用系列选项调整钢筋的间距和高度。



编辑:



列标签与@Jon Peltier匹配程度更高或更低,但不重要这里。它们可以被视为仅仅是增量。基于注释提供的更具体的值:




I need to prepare such diagrams:

I think it's quite intuitive how to read this diagram and this is why I want to create a few of them for my project.

I am quite confused how to create them efficiently; I've painted the one above in Paint just to quickly visualize my idea and it took too long imo. Moreover the time axis is not accurate.

I have precise data with event times (eg. loading start in process 1, loading end in process 1, algorithm start in process 2 etc.) e.g.

Process 1:
00.0 - 40.0 - Loading
40.0 - 45.0 - Preparing and launching process 2
45.0 - 50.0 - Preparing and launching process 3
50.0 - 90.0 - Sleep
90.0 - 95.0 - Joining process 2
...

Process 2:
45.0 - 90.0 - Algorithm execution
...

How to generate such timeline diagrams?

I am using MS Windows 7 and have Office 2010 installed, but am willing to use anything that gets the job done..

解决方案

Basically, use a stacked bar chart:

To explain all the steps in detail would be a nightmare but in outline, the data is roughly as shown A1:H4. Format the data series white where required to blend into the background. Add data labels and change their text as required ('merge 1' etc).

I cheated and drew lines (eg within 'Loading') and formatted them white but extra 'connectors' of 1 ms should serve (and would then scale, unlike the drawn lines). Adjust the separation and height of the bars with Series Options.

Edit:

The column labels more-or-less match up with @Jon Peltier but are not important here. They can be taken as merely increments in order. Based on the more specific values provided by comment: