Expression Blend 4 / Sketchflow和Team Foundation Server 2010 [英] Expression Blend 4 / Sketchflow and Team Foundation Server 2010
问题描述
我已经使用sketchflow安装了表达式混合4。我真的很喜欢这些工具。但是与TFS 2010集成的故事是什么?对于表达式3,我们有一个能够连接到TFS的插件。作为一名顾问,我可以在Blend中创建完美的交互
设计,但我想将它们与TFS中的用户故事同步。
I have installed expression blend 4 with sketchflow. And I really like the tools. But what is the story with the integration with TFS 2010? For expression 3 we had a plugin that was able to connect to TFS. As a consultant I can create perfect interaction designs in Blend, but I want to synchronise them with the user stories in TFS.
在blend3中,例如可以导出反馈对于TFS任务,还有可能吗?
In blend3 it was for example possible to export feedback to a TFS task, is that still possible?
谢谢,你有一个很棒的产品!
Thanks and you have a great product!
推荐答案
Remco,
Remco,
Expression Blend 4在没有TFS 2010的插件或补丁的情况下正常工作。您首先使用Visual Studio 2010将解决方案添加到源代码控制中,然后从Blend重新打开它。
Expression Blend 4 work fine without plugins or patches with TFS 2010. You first add the solution to source code control with Visual Studio 2010 and re-open it from Blend.
ciao,
这篇关于Expression Blend 4 / Sketchflow和Team Foundation Server 2010的文章就介绍到这了,希望我们推荐的答案对大家有所帮助,也希望大家多多支持IT屋!