在2个Sharepoint日历之间绑定事件 [英] Bind events between 2 sharepoint calendars

查看:58
本文介绍了在2个Sharepoint日历之间绑定事件的处理方法,对大家解决问题具有一定的参考价值,需要的朋友们下面随着小编来一起学习吧!

问题描述

In Sharepoint i have created 2 separate calendars. I also created a workflow with which automatically when i create an event to first calendar, this event is automatically created to the second calendar.

但是这两个事件之间没有任何联系.因此,如果我要编辑初始事件或将其删除,则这些更改也不会对第二个日历事件进行.有谁知道自动创建第二个事件时如何自动绑定两个事件 通过工作流程?我需要一个新的工作流程吗?一个用于编辑,一个用于删除?

But there is no connection afterwards between those 2 events. So, if i want to edit initial event or delete it, those changes are not made to the second calendar event also. Does anyone knows how to automatically bind 2 events when second one is created automatically via workflow? Do i need a new workflow?One for edit and one for deletion?

请提供编辑或删除方案的示例.

Please advise with an example of editing or deleting scenario.

预先谢谢您

推荐答案

嗨pm4698,

Hi pm4698,

根据您的描述,您想在第二个日历上显示第一个日历的事件并保持同步.是吗?

From your description, you want to show events of the first calendar on the second calendar and keep the sync. Is it right?

您可以考虑使用日历覆盖图"功能来代替工作流.

You can consider using Calendar Overlay feature to do that instead of workflows.

有一篇有关日历覆盖的文章,您可以看一下:

There is an article about Calendar Overlay, you can take a look at:

https://deannaschneider. wordpress.com/2011/09/28/calendar-overlay-a-simple-sharepoint-2010-ootb-master-calendar/

谢谢

Wendy


这篇关于在2个Sharepoint日历之间绑定事件的文章就介绍到这了,希望我们推荐的答案对大家有所帮助,也希望大家多多支持IT屋!

查看全文
登录 关闭
扫码关注1秒登录
发送“验证码”获取 | 15天全站免登陆