在Sprint计划之后,如何查询添加到Sprint中的工作项(用户故事)? [英] How can I query work items (User Stories) that added into Sprint after Sprint Planning?

查看:47
本文介绍了在Sprint计划之后,如何查询添加到Sprint中的工作项(用户故事)?的处理方法,对大家解决问题具有一定的参考价值,需要的朋友们下面随着小编来一起学习吧!

问题描述

在Azure DevOps中,如何使用查询或任何其他方法向下钻取并获得随着总范围的增加而添加了哪些工作项的列表?

In Azure DevOps, how can I drill down and get a list of which work items are added as total scope increase using queries or any other method?

推荐答案

我正面临着同样的挑战.我已经能够使用以下方法生成在冲刺期间添加的未完成工作项的列表.它不考虑在sprint开始并在sprint中完成之后添加的那些项,因为它仅基于剩余工作:

I was facing the same challenge. I have been able to generate a list of non-completed work items that were added during the sprint using the following method. It doesn't take into account those items that were added after sprint start AND finished in the sprint, as it is based on remaining work only:

  1. 点击Sprint板中的Analytics(分析)
  2. 积压/工作项设置为积压项积压"
  3. 将设置为工作项目计数"的细分
  4. 单击图表中最右边的点以进行剩余工作(您可以通过单击图例来禁用重叠曲线)

  1. 这将导致您查询包含所有工作项ID的查询.复制该字符串.
  2. 对sprint的开头执行相同的操作,最左边的蓝点.也复制该字符串.
  3. 使用分别来自5和6的字符串创建一个新查询,如下所示

/克里斯·L.

这篇关于在Sprint计划之后,如何查询添加到Sprint中的工作项(用户故事)?的文章就介绍到这了,希望我们推荐的答案对大家有所帮助,也希望大家多多支持IT屋!

查看全文
登录 关闭
扫码关注1秒登录
发送“验证码”获取 | 15天全站免登陆