如何重新配置​​Project Server以更改TFS服务器名称? [英] howto Reconfigure Project Server for change in TFS Server name ?

查看:120
本文介绍了如何重新配置​​Project Server以更改TFS服务器名称?的处理方法,对大家解决问题具有一定的参考价值,需要的朋友们下面随着小编来一起学习吧!

问题描述

TFS到Project服务器集成配置似乎没问题 - 通过运行
TFSAdmin ProjectServer 来验证设置以下开关:



  • / GetRegisteredPWA
  • / GetMappedCollections
  • / GetMappedProjects
  • / GetMappedWorkItemTypes
  • / DownloadFieldMappings

N ote:TFS SE在PWA注册之后但在映射集合之前重新命名了rver


但是当我尝试验证数据同步时,从MS Project客户端,n 似乎正在发生任何事情:



  • 我已从PWA URI打开已发布的企业项目
  • 在甘特图视图中,我添加了2列:"发布到团队项目"和"工作项类型(TFS)" - ( 2 nd  列
    有下拉支持
    ? - 只有第一个支持
  • 我选择了一个任务并且用于" ;发布到团队项目"我选择"是"和"和"工作项类型(TFS)"我输入"任务"(绝对是映射的工作项类型)
  • 我选择文件>信息>发布(我选择"此时不创建网站" -
    我是否需要创建网站?) - I p ress Publish - 我看到"Publish Completed successfully"在底部的状态栏中。

在TFS中,任务工作项是只是不显示



  • Tfsadmin projectserver / getsyncmessages
    不显示任何消息
  • 事件日志未显示任何错误消息。

我正在运行Project 2010版本14.0 .6123.5001(32位)在我运行Visual Studio 2010 SP1的同一台机器上。


Team Foundation插件是否检测到项目计划是一个映射计划? 我执行
查看名为
的视图 
Team Foundation Gantt(Project Server)


如何才能使数据同步有效?


如何解决此问题?


解决方案

所以如果TFS服务器已重命名,i s项目服务器端有一些配置设置指向新的TFS URI ???


当我从Project 2010打开企业项目时,托盘中的消息显示它正在尝试验证TFS连接,然后弹出消息框up 



Team Foundation服务不能从服务器http:// xyz:8080 / tfs 



似乎项目服务器指向旧的TFS服务器名称!


如果我编辑客户端上的hosts文件并将旧的TFS主机名指向其IP地址,那么它可以工作! / p>

但是我不想为每个客户端执行此操作或修改TFS,那么如何更新PWA以指向新的TFS域名?


TFS to Project server  integration configuration appears to OK – settings were verified by running TFSAdmin ProjectServer with the following switches:

  • /GetRegisteredPWA
  • /GetMappedCollections
  • /GetMappedProjects
  • /GetMappedWorkItemTypes
  • /DownloadFieldMappings

Note: the TFS server was renamed after the PWA was registered but before the collection was mapped.

However when I try verify data synchronization, from MS Project client, nothing seems to be happening:

  • I've opened a published enterprise project from the PWA URI
  • In Gantt Chart view, I've added 2 columns: "Publish to Team Project" and "Work Item Type (TFS)" – (should the 2nd column have drop down support? – only the first does)
  • I pick a task and for "Publish to Team Project" I select "yes" and for "Work Item Type (TFS)" I type "Task" (definitely a mapped work item type)
  • I select File > Info > Publish (I select "do not create a site at this time" - Do I need to create a site?) – I press Publish – I see "Publish Completed successfully" in status bar at bottom.

In TFS, the Task Work Item is just not showing up.

  • Tfsadmin projectserver /getsyncmessages is not showing any messages
  • The event log is not showing any error messages.

I am running Project 2010 version 14.0.6123.5001 (32 bit) on the same machine that I am running Visual Studio 2010 SP1.

Is the Team Foundation add-in detecting that the project plan is a mapped plan?  I do NOT see a view called Team Foundation Gantt (Project Server).

How can I get data synchronization working ?

How can I troubleshoot this issue ?

解决方案

so if the TFS server was renamed, is there some config setting on the project server side to point to the new TFS URI ???

When I open the enterprise project from Project 2010, a message in the tray says it is trying to verify TFS connectivity, and then a messagebox pops up 

Team Foundation services are not available from server http://xyz:8080/tfs 

it appears that project server is pointing to the old TFS server name!

If I edit the hosts file on my client and point the old TFS host name to its ip address, then it works!

However I dont want to do this for every client or modify the TFS, so how do I update the PWA to point to the new TFS domain name ?