当用户AD显示名称具有来自TFS的逗号时同步错误 [英] Sync error when user AD display name has comma from TFS

查看:109
本文介绍了当用户AD显示名称具有来自TFS的逗号时同步错误的处理方法,对大家解决问题具有一定的参考价值,需要的朋友们下面随着小编来一起学习吧!

问题描述


详细消息:TF285010:以下用户不是有效的Project Server资源:Doe,John。将Team Foundation用户添加到企业资源库。

我们的AD显示名称使用最后一个。 我们无法改变这一点,因为存在风险和影响。

Our AD display name uses Last, First.  We cannot change this as there are risks and impacts.

从Project Server 2010中,企业资源池加载了AD用户,其显示名称从
Last,First First Last 进行操作以获取它可以正确加载到Project Server中。 从TFS 2010 SP1开始,用户显示
Last,First。  同步在此场景中是否有效?是否有任何解决方法可以使同步工作? 下面的Brian Harry帖子说这已经在RTM版本中得到了纠正,但我没有看到相同的结果。

From Project Server 2010, the enterprise resource pool is loaded with AD users with their display name manipulated from Last, First to First Last to get it to load correctly into Project Server.  From TFS 2010 SP1, the users are displayed Last, First.  Does the sync work in this senario? Are there any workarounds to make the sync work?  Brian Harry post below says that this has been corrected in the RTM version but I'm not seeing the same result.

这发布自Brian Harry
http://blogs.msdn.com/b/bharry/archive/2011/03/08/vs-tfs-2010-sp1-and-tfs-project -server-integration-feature-pack-have-released.aspx

This is posted from Brian Harry http://blogs.msdn.com/b/bharry/archive/2011/03/08/vs-tfs-2010-sp1-and-tfs-project-server-integration-feature-pack-have-released.aspx:

谢谢。

推荐答案

Hi Tai,问题已在Feature Pack的RTM版本中修复。您能否确认您拥有RTM版本而不是Beta版本?假设您拥有RTM版本,接下来要确保的是用户Doe,John是Project Server
企业资源池的一部分。假设是这种情况,接下来要看的是用户Doe,John是项目计划中资源表的一部分,也就是说,项目经理已经转到MS Project并从企业资源中提取该用户
池进入项目计划资源表。如果您在上述问题后仍有问题,请告诉我。谢谢,-Siddharth
Hi Tai, The issue is fixed in the RTM version of the Feature Pack. Can you confirm that you have the RTM version and not the Beta version? Assuming you have the RTM version, the next thing to ensure is that the user Doe, John is part of the Project Server enterprise resource pool. Assuming that is the case, the next thing to look at is that the user Doe, John is part of the resource sheet in the project plan, that is, the project manager has gone to MS Project and pulled in that user from the enterprise resource pool into the project plan resource sheet. Please let me know if you still have the issue after the above. Thanks, -Siddharth


这篇关于当用户AD显示名称具有来自TFS的逗号时同步错误的文章就介绍到这了,希望我们推荐的答案对大家有所帮助,也希望大家多多支持IT屋!

查看全文
登录 关闭
扫码关注1秒登录
发送“验证码”获取 | 15天全站免登陆