多级时间表批准 [英] Multi Level timesheet approvals

查看:108
本文介绍了多级时间表批准的处理方法,对大家解决问题具有一定的参考价值,需要的朋友们下面随着小编来一起学习吧!

问题描述

我的情况是时间表要由资源(即线路)经理批准。  但是,在某些情况下,一旦生产线经理批准了时间表,系统就要求进一步批准。 (这不是必需的)。
批准状态为下一个人的姓名提供了一个框。  此功能似乎随机出现,但我猜有一些参数可以确定是否需要多级签名。  我们以单一模式运营。
无论固定路由是打开还是关闭,都会发生这种情况。  我还缺少其他设置吗?

解决方案

Binnz,


您需要设置时间表批准者链。请参阅以下内容:


http://www.projectserverexperts.com/ProjectServerFAQKnowledgeBase /ChainOfTimesheetApprovers.aspx


I have a situation where timesheets are to be approved by a resource (ie line) manager.  However in some situations the system demands that a further level of approval is required, once the line manager has approved the timesheet. (this is not required). The approval status provides a box for the next person's name to be entered.  This feature seems to appear randomly but I guess there is some parameter that determines whether multiple level of signature is required.  We are operating in single mode. It occurs whether fixed routing is switched on or off.  Are there any other settings I am missing?

解决方案

Binnz,

You will need to setup the Chain of Timesheet Approvers. Please see the arcticle below:

http://www.projectserverexperts.com/ProjectServerFAQKnowledgeBase/ChainOfTimesheetApprovers.aspx


这篇关于多级时间表批准的文章就介绍到这了,希望我们推荐的答案对大家有所帮助,也希望大家多多支持IT屋!

查看全文
登录 关闭
扫码关注1秒登录
发送“验证码”获取 | 15天全站免登陆