从2013年自定义工作流开始2010年OOB三态工作流 [英] Start 2010 OOB Three State Workflow from 2013 Custom Workflow

查看:99
本文介绍了从2013年自定义工作流开始2010年OOB三态工作流的处理方法,对大家解决问题具有一定的参考价值,需要的朋友们下面随着小编来一起学习吧!

问题描述

我有一个列表,其中附加了现有的三态工作流程.要求新的功能和自定义,但是三态功能仍然有用途,但是并不是从创建时就开始.我想知道是否有办法 从自定义工作流程手动启动工作流程.我正在尝试使用开始列表工作流程"操作,但是当我尝试选择"2010列表工作流程"时,它没有显示在下拉列表中.我尝试了所有可以想到的权限,我是网站管理员, 并且通过手动启动可以激活工作流程.有任何建议吗?

I have a list that has an existing three state workflow attached.  New functionality and customizations were requested, but there is still a use for the three state functionality, however, not to start at creation. I'm wondering if there is any way to manually start the workflow from the custom workflow. I'm trying to use the Start List Workflow action, but when I try to select the 2010 List workflow, it is not showing up in the dropdown. I've tried every permission I can think of, I'm a site administrator, and the workflow is active with manual start.  Any suggestions? 

推荐答案

bgordon1

Hi bgordon1,

启动列表工作流",基于SharePoint Designer的SharePoint 2010工作流平台而不是SharePoint 2010 OOB工作流模板,启动列表工作流.因此,您无法使用启动列表"来启动三态"工作流程 工作流程"行动.

"Start a List Workflow" starts a List workflow based on the SharePoint 2010 Workflow platform of SharePoint Designer, not SharePoint 2010 OOB workflow templates. So, you are unable to start your Three State workflow using "Start a List Workflow" action.

您可以更改三态"工作流程设置,然后在开始选项"中将其设置为允许此工作流程由具有编辑项目"权限的经过身份验证的用户手动启动".然后,您可以通过选择一个项目->省略号来手动启动工作流程 ->工作流程"-> [您的三状态工作流程]旁边.

You can change your Three State workflow setting, and in Start Options, set it to "Allow this workflow to be manually started by an authenticated user with Edit Item permissions". Then you can start the workflow manually via selecting an item->the ellipsis next to the item->Workflows->[your Three state workflow].

有关手动启动三态工作流程的更多信息,您可以参考:

More information about starting a three state workflow manually, you can refer to:

谢谢

Wendy

这篇关于从2013年自定义工作流开始2010年OOB三态工作流的文章就介绍到这了,希望我们推荐的答案对大家有所帮助,也希望大家多多支持IT屋!

查看全文
登录 关闭
扫码关注1秒登录
发送“验证码”获取 | 15天全站免登陆