更新此列表工作流程中的项目 [英] Update item in this list workflow

查看:62
本文介绍了更新此列表工作流程中的项目的处理方法,对大家解决问题具有一定的参考价值,需要的朋友们下面随着小编来一起学习吧!

问题描述

所以我真的无法让工作流程正常工作。

So I'm really having trouble getting a workflow to work.

我需要提交表单中的值来填充其他列表列。

I need a value from a submitted form to populate another lists column.

第一个列表被命名为Laptop Request,第二个列表被命名为Check Out Devices。

1st list is named Laptop Request, 2nd list is named Check Out Devices.

在第一个列表中,我有一个名为Due Date的日期/时间列,在第二个列表中我有一个名为截止日期的文本列。

In the 1st list I have a date/time column called Due Date, in the second list I have a text column called Due Date.

我想在提交表单后获取在第一个列表的截止日期列中生成的值,并将该值传输到截止日期我的第二个清单上的日期列。

I would like to take the value that generates in the Due Date column of the 1st list after the form is submitted and transfer that value to the Due Date column on my 2nd list.

工作流似乎是一个简单的解决方案,但我没有任何类型的运气。

Workflows seemed like an easy solution however I am not having any type of luck whatsoever.

我以为我会能够通过"此列表中的更新项目"掀起一些东西,但我对如何设置它感到困惑。

I thought I would be able to whip up something with 'Update item in this list' but I'm so confused on how to set it up.

我希望我有一些知识渊博的人来帮助我完成这些对话而不是告诉我在论坛中看到有多个帖子可以解释,我看了很多但是这些情景rios与我的不同,我似乎无法复制
对他们有用的东西。

I wish I had someone knowledgeable to help me with these dialogs instead of telling me to look in the forums saying there are multiple posts that explain, I've looked at a lot of them but the scenarios are just different from mine and I can't seem to replicate what works for them.

推荐答案

您需要在列表之间创建关系,一旦用户提交表单,它就会通过表单插入到第二个列表中WF。您还可以使用与列表相关的参考列。

You need to create the relationship between your lists , as soon as you user submits the form it will be inserted into second list through WF. You can also have the reference column that correlates the list.

示例:在列表1中,您有ID,您可以在第二个列表中创建列,该列可以以第一个列表为前缀列

Example: In list 1, you have the ID, you can create the column in second list which can be prefixed with the first list column

如果使用在生成ID的第一个列表中提交请求,您可以将其插入第二个列表中,格式为 例如"ID-Device-Model"。

If use submit the request in first list that generates the ID, you can insert this in second list with formatted  like "ID-Device-Model".

在更新列表项的工作流程中,设置第一个字段的字段和第二个列表列的值。 

In your workflow on update list item, set the field of your first and the value of the second list column. 


这篇关于更新此列表工作流程中的项目的文章就介绍到这了,希望我们推荐的答案对大家有所帮助,也希望大家多多支持IT屋!

查看全文
登录 关闭
扫码关注1秒登录
发送“验证码”获取 | 15天全站免登陆